These two new practices include enhanced recovery of a greater range of metals smaller than 0.47 inches from WTE bottom ash and the permitted reuse of bottom ash in road construction projects.
Of the nearly 30 million tons of municipal solid waste processed by WTE facilities in the U.S. each year, about 7 million tons is left as bottom ash, noncombustible materials and solids from the air pollution control systems (fly ash). That material is collectively referred to as WTE ash.
Conventional metal recovery systems are often limited to processing of feedstock materials and large (greater than 0.47 inches) fragments in bottom ash. However, new systems being introduced in Europe have begun targeting the smaller fragments with a greater emphasis on bottom ash.
"The issuance of this report demonstrates the important role that the SWANA Applied Research Foundation and its 45 subscribing organizations are playing in promoting innovation and sustainability in the management of municipal solid waste (MSW) in North America" says Jeremy O'Brien, SWANA's director of applied research.
The ARF report studied the implementation of one such approach by the Lancaster County, Pennsylvania, Solid Waste Management Authority (LCSWMA). The authority signed a 10-year contract with Inashco North America Inc., Annapolis, Maryland, to use an Advanced Dry Recovery (ADR) system to supplement existing in-line metal recovery systems. The system is expected to increase LCSWMA’s metals recovery from ash by 46 percent, including greater recovery of ferrous, nonferrous and precious metals and to provide additional revenues to LCSWMA over the contract period.
The ARF report also considered how the European model of managing bottom and fly ash separately could lead to greater recovery. Most U.S. WTE plants mix the two streams in order to manage them as a combined ash; as fly ash, managed individually, is considered a hazardous waste.
It documented the efforts of Pasco County, Florida, which changed its ash management approach to mix only enough bottom ash with fly ash—at a ratio of 25 percent bottom ash to 75 percent fly ash—to render the mixture non-hazardous. This new approach frees up 83 percent of the bottom ash to be reused as construction aggregates.
Sponsored Content
SENNEBOGEN 340G telehandler improves the view in Macon County, NC
An elevated cab is one of several features improving operational efficiency at the Macon County Solid Waste Management agency in North Carolina. When it comes to waste management, efficiency, safety and reliability are priorities driving decisions from day one, according to staff members of the Macon County Solid Waste Management Department in western North Carolina. The agency operates a recycling plant in a facility originally designed to bale incoming materials. More recently, the building has undergone significant transformations centered around one machine: a SENNEBOGEN telehandler (telescopic handler).
Sponsored Content
SENNEBOGEN 340G telehandler improves the view in Macon County, NC
An elevated cab is one of several features improving operational efficiency at the Macon County Solid Waste Management agency in North Carolina. When it comes to waste management, efficiency, safety and reliability are priorities driving decisions from day one, according to staff members of the Macon County Solid Waste Management Department in western North Carolina. The agency operates a recycling plant in a facility originally designed to bale incoming materials. More recently, the building has undergone significant transformations centered around one machine: a SENNEBOGEN telehandler (telescopic handler).
Sponsored Content
SENNEBOGEN 340G telehandler improves the view in Macon County, NC
An elevated cab is one of several features improving operational efficiency at the Macon County Solid Waste Management agency in North Carolina. When it comes to waste management, efficiency, safety and reliability are priorities driving decisions from day one, according to staff members of the Macon County Solid Waste Management Department in western North Carolina. The agency operates a recycling plant in a facility originally designed to bale incoming materials. More recently, the building has undergone significant transformations centered around one machine: a SENNEBOGEN telehandler (telescopic handler).
Sponsored Content
SENNEBOGEN 340G telehandler improves the view in Macon County, NC
An elevated cab is one of several features improving operational efficiency at the Macon County Solid Waste Management agency in North Carolina. When it comes to waste management, efficiency, safety and reliability are priorities driving decisions from day one, according to staff members of the Macon County Solid Waste Management Department in western North Carolina. The agency operates a recycling plant in a facility originally designed to bale incoming materials. More recently, the building has undergone significant transformations centered around one machine: a SENNEBOGEN telehandler (telescopic handler).
Sponsored Content
SENNEBOGEN 340G telehandler improves the view in Macon County, NC
An elevated cab is one of several features improving operational efficiency at the Macon County Solid Waste Management agency in North Carolina. When it comes to waste management, efficiency, safety and reliability are priorities driving decisions from day one, according to staff members of the Macon County Solid Waste Management Department in western North Carolina. The agency operates a recycling plant in a facility originally designed to bale incoming materials. More recently, the building has undergone significant transformations centered around one machine: a SENNEBOGEN telehandler (telescopic handler).
Sponsored Content
SENNEBOGEN 340G telehandler improves the view in Macon County, NC
An elevated cab is one of several features improving operational efficiency at the Macon County Solid Waste Management agency in North Carolina. When it comes to waste management, efficiency, safety and reliability are priorities driving decisions from day one, according to staff members of the Macon County Solid Waste Management Department in western North Carolina. The agency operates a recycling plant in a facility originally designed to bale incoming materials. More recently, the building has undergone significant transformations centered around one machine: a SENNEBOGEN telehandler (telescopic handler).
Following a successful pilot test program, the Pasco County Solid Waste Recovery Facility received the first permit ever issued by a state government authorizing the use of WTE bottom ash as an aggregate in road construction. The use of bottom ash in road construction would increase local diversion to almost 94 percent of the waste processed through Pasco County's WTE facility from landfill disposal into recovery as energy or reusable materials and metals.
To learn more about ash management and the projects studied in ARF’s “Innovations in Waste-to-Energy Ash Management” report, click here.
Get curated news on YOUR industry.
Enter your email to receive our newsletters.
Latest from Waste Today
- US Senate backs reduced cuts to EPA
- Waste Connections announces Q2 results
- Returnity and Cosmoprof to address reusable bag waste
- SWANA releases report on aging WTE facilities
- New economic assessment reveals cost benefits of California’s SB 54
- Premier Truck Sales & Rental opens new facility
- TeknTrash Robotics, Sharp Group partner on humanoid robot pilot
- Stadler equips mixed waste sorting plant in Sweden