
LaGoe’s responsibilities will include directing the design and development of large scale, turnkey, mechanical systems for the processing and production of alternative fuel feedstock from biomass and waste, as well as general waste recycling and treatment systems. In order to ensure continuous quality control, he also will oversee the manufacture and implementation of projects once the engineering phase has been completed.
“Over the last three years Mike’s job performance, as both an engineer and as a manager, has been exemplary. When the need arose for a director of this department, Mike was the obvious choice to fill the role,” says to Len Beusse, COO of Vecoplan.
Vecoplan is a global leader in waste and biomass processing technologies, including receiving, size reduction, screening, separation, optical sorting, material handling, storage, metered feeding and integrated control systems.
Latest from Waste Today
- US Senate backs reduced cuts to EPA
- Waste Connections announces Q2 results
- Returnity and Cosmoprof to address reusable bag waste
- SWANA releases report on aging WTE facilities
- New economic assessment reveals cost benefits of California’s SB 54
- Premier Truck Sales & Rental opens new facility
- TeknTrash Robotics, Sharp Group partner on humanoid robot pilot
- Stadler equips mixed waste sorting plant in Sweden